Connecting people to information and ideasOptimizing your business & tapping new revenue streams
Exceleron Communications
Network Rollout, Swap & Migration · Network Rollout & Swap Service

Network rollout, vendor swap and migration

Greenfield rollout, sector additions, vendor swaps, merger integration and RAN and core migration, verified with drive tests at every stage.

10,700+Sites rolled out, swapped or merged
4,000+ZTE sites for Zong
1,200Ericsson to ZTE swap
800+Jazz–Warid merger sites
The journey

How Rollout works

A view of how work moves through Network Rollout, Swap & Migration.

1Pre driveBenchmark today2BuildRollout or swap3Static testSite by site4Post driveCluster drives5AcceptKPIs confirmed
01 · Challenge

The challenge

Teams looking at Network Rollout, Swap & Migration usually face risky cutovers, thousands of sites and several vendors at once. A swap or merger can drop coverage and KPIs overnight if it is not tested. Large programmes need site-by-site verification without losing pace. Old and new vendor equipment must work side by side during the change. Left alone, these problems slow people down and make results harder to prove.

Risky cutovers

A swap or merger can drop coverage and KPIs overnight if it is not tested.

Thousands of sites

Large programmes need site-by-site verification without losing pace.

Several vendors at once

Old and new vendor equipment must work side by side during the change.

02 · Capabilities

What it does

Network Rollout, Swap & Migration covers Greenfield rollout, 4G overlay and MIMO, Vendor swap, Merger integration, RAN and core migration and Single site verification in one solution. Each capability below does a specific job, and together they follow the work from pre drive to accept.

Greenfield rollout

New 2G, 3G and 4G sites and sector additions, verified site by site.

4G overlay and MIMO

LTE overlay with 4T4R, 4T6S and Massive MIMO configurations.

Vendor swap

Pre drives, swap and static testing, then post drives and RF antenna audits.

Merger integration

Combining two operators’ radio networks, as in the Jazz–Warid merger.

RAN and core migration

2G, 3G and 4G RAN and CS core migration, including EPC swaps.

Single site verification

Each site checked for coverage, KPIs and installation before acceptance.

03 · How it works

How it works

Network Rollout, Swap & Migration follows 5 clear steps. Pre drives record coverage and KPIs before any change. From there, work moves through each stage until the final step: post-drive reports confirm the network meets its KPIs.

  1. Benchmark

    Pre drives record coverage and KPIs before any change.

  2. Execute

    Sites are rolled out or swapped to the agreed plan.

  3. Test

    Static tests and single site verification check each site.

  4. Optimise

    Cluster drives and optimisation recover any lost performance.

  5. Accept

    Post-drive reports confirm the network meets its KPIs.

In detail

Specifications

Key technical details for Network Rollout, Swap & Migration.

Zong (CMPAK) · ZTERollout, swap and expansion: 4,000+ sites, 2G/3G/4G, 4T4R and Massive MIMO
Jazz · ZTERollout and swap: 3,000+ sites, 2G/3G/4G, 4T6S, MIMO and FMM
Jazz · Nokia4G overlay rollout and sector addition: 1,000+ sites, LTE and MIMO
Telenor · ZTERollout and swap: 700+ sites, 2G/3G/4G
Jazz · Ericsson to ZTEVendor swap: 1,200 sites nationwide
Jazz–Warid merger · ZTEMerger integration: 800+ sites nationwide
Cellcard, CambodiaMigration of 2G/3G/4G RAN and CS core from Huawei and Nokia to ZTE, including the EPC
04 · Outcomes

Outcomes

The result is a clearer way of working: pre-drive benchmark for every cluster, performance recovered by optimisation, site-by-site verification, tested multi-vendor coexistence and acceptance backed by drive data. These are the changes teams should expect once Network Rollout, Swap & Migration is part of daily operations.

10,700+Sites delivered
4Operators served
TestedBefore and after cutover
AcceptedAgainst operator KPIs
05 · Audience

Who it's for

Network Rollout, Swap & Migration is designed for Mobile operators, Network vendors, Programme managers and Core teams. Each group gets something different from it, as the cards below show.

Mobile operators

Expansion, modernisation and mergers.

Network vendors

Rollout and swap delivery capacity.

Programme managers

Site-by-site progress and acceptance.

Core teams

RAN and CS core migration support.

Track record

Work we have delivered

Named programmes where Exceleron has delivered network rollout, swap & migration.

  • Rollout and swap programmes for Zong (CMPAK), Jazz and Telenor with ZTE and Nokia: more than 8,700 sites.
  • Ericsson to ZTE swap of 1,200 Jazz sites, and 800+ sites integrated in the Jazz–Warid merger.
  • RAN and CS core migration for Cellcard, Cambodia, from Huawei and Nokia to ZTE: planning, execution and KPI validation.
07 · Change

Before and after

What changes for your team with Rollout.

Before

  • Cutovers without a benchmark
  • Coverage lost after a swap
  • Site status in spreadsheets
  • Vendor clashes in mixed areas
  • Disputed acceptance

With Rollout

  • Pre-drive benchmark for every cluster
  • Performance recovered by optimisation
  • Site-by-site verification
  • Tested multi-vendor coexistence
  • Acceptance backed by drive data
08 · Technology

Technology explained

These are the technologies and formats Network Rollout, Swap & Migration works with, explained in plain language.

LTE
4G mobile network technology.
MIMO
Multiple antennas at each end of the link, raising speed and reliability.
Massive MIMO
Antenna arrays with many elements that serve several users at once.
4T4R
A radio with four transmit and four receive paths for higher capacity.
EPC
Evolved Packet Core: the core network behind 4G LTE.
CS core
Circuit-switched core that handles traditional voice calls and SMS.
Single site verification
Checking a new or changed site for coverage, KPIs and installation before acceptance.