Network rollout, vendor swap and migration
Greenfield rollout, sector additions, vendor swaps, merger integration and RAN and core migration, verified with drive tests at every stage.
How Rollout works
A view of how work moves through Network Rollout, Swap & Migration.
Product resources
The challenge
Teams looking at Network Rollout, Swap & Migration usually face risky cutovers, thousands of sites and several vendors at once. A swap or merger can drop coverage and KPIs overnight if it is not tested. Large programmes need site-by-site verification without losing pace. Old and new vendor equipment must work side by side during the change. Left alone, these problems slow people down and make results harder to prove.
Risky cutovers
A swap or merger can drop coverage and KPIs overnight if it is not tested.
Thousands of sites
Large programmes need site-by-site verification without losing pace.
Several vendors at once
Old and new vendor equipment must work side by side during the change.
What it does
Network Rollout, Swap & Migration covers Greenfield rollout, 4G overlay and MIMO, Vendor swap, Merger integration, RAN and core migration and Single site verification in one solution. Each capability below does a specific job, and together they follow the work from pre drive to accept.
Greenfield rollout
New 2G, 3G and 4G sites and sector additions, verified site by site.
4G overlay and MIMO
LTE overlay with 4T4R, 4T6S and Massive MIMO configurations.
Vendor swap
Pre drives, swap and static testing, then post drives and RF antenna audits.
Merger integration
Combining two operators’ radio networks, as in the Jazz–Warid merger.
RAN and core migration
2G, 3G and 4G RAN and CS core migration, including EPC swaps.
Single site verification
Each site checked for coverage, KPIs and installation before acceptance.
How it works
Network Rollout, Swap & Migration follows 5 clear steps. Pre drives record coverage and KPIs before any change. From there, work moves through each stage until the final step: post-drive reports confirm the network meets its KPIs.
Benchmark
Pre drives record coverage and KPIs before any change.
Execute
Sites are rolled out or swapped to the agreed plan.
Test
Static tests and single site verification check each site.
Optimise
Cluster drives and optimisation recover any lost performance.
Accept
Post-drive reports confirm the network meets its KPIs.
Specifications
Key technical details for Network Rollout, Swap & Migration.
| Zong (CMPAK) · ZTE | Rollout, swap and expansion: 4,000+ sites, 2G/3G/4G, 4T4R and Massive MIMO |
|---|---|
| Jazz · ZTE | Rollout and swap: 3,000+ sites, 2G/3G/4G, 4T6S, MIMO and FMM |
| Jazz · Nokia | 4G overlay rollout and sector addition: 1,000+ sites, LTE and MIMO |
| Telenor · ZTE | Rollout and swap: 700+ sites, 2G/3G/4G |
| Jazz · Ericsson to ZTE | Vendor swap: 1,200 sites nationwide |
| Jazz–Warid merger · ZTE | Merger integration: 800+ sites nationwide |
| Cellcard, Cambodia | Migration of 2G/3G/4G RAN and CS core from Huawei and Nokia to ZTE, including the EPC |
Outcomes
The result is a clearer way of working: pre-drive benchmark for every cluster, performance recovered by optimisation, site-by-site verification, tested multi-vendor coexistence and acceptance backed by drive data. These are the changes teams should expect once Network Rollout, Swap & Migration is part of daily operations.
Who it's for
Network Rollout, Swap & Migration is designed for Mobile operators, Network vendors, Programme managers and Core teams. Each group gets something different from it, as the cards below show.
Mobile operators
Expansion, modernisation and mergers.
Network vendors
Rollout and swap delivery capacity.
Programme managers
Site-by-site progress and acceptance.
Core teams
RAN and CS core migration support.
Work we have delivered
Named programmes where Exceleron has delivered network rollout, swap & migration.
- Rollout and swap programmes for Zong (CMPAK), Jazz and Telenor with ZTE and Nokia: more than 8,700 sites.
- Ericsson to ZTE swap of 1,200 Jazz sites, and 800+ sites integrated in the Jazz–Warid merger.
- RAN and CS core migration for Cellcard, Cambodia, from Huawei and Nokia to ZTE: planning, execution and KPI validation.
Before and after
What changes for your team with Rollout.
Before
- Cutovers without a benchmark
- Coverage lost after a swap
- Site status in spreadsheets
- Vendor clashes in mixed areas
- Disputed acceptance
With Rollout
- Pre-drive benchmark for every cluster
- Performance recovered by optimisation
- Site-by-site verification
- Tested multi-vendor coexistence
- Acceptance backed by drive data
Technology explained
These are the technologies and formats Network Rollout, Swap & Migration works with, explained in plain language.
- LTE
- 4G mobile network technology.
- MIMO
- Multiple antennas at each end of the link, raising speed and reliability.
- Massive MIMO
- Antenna arrays with many elements that serve several users at once.
- 4T4R
- A radio with four transmit and four receive paths for higher capacity.
- EPC
- Evolved Packet Core: the core network behind 4G LTE.
- CS core
- Circuit-switched core that handles traditional voice calls and SMS.
- Single site verification
- Checking a new or changed site for coverage, KPIs and installation before acceptance.